Tuesday, September 27, 2011

MTN

After waiting a week for a new bit to arrive, this cabinet is starting to finally take shape. Some more sanding and cutting of the material is needed before moving in for staining. There are also two more engravings on the inside of the doors which I'll post some pictures of later tonight.


- Posted using BlogPress from my iPhone4

Saturday, September 17, 2011

USC Maple cabinet

This cabinet is ready to ship out on Monday. It features a satin finish and painted logos. The cabinet also features Blum 170degree hinges and LED light strips.








- Posted using BlogPress from my iPhone4

Tuesday, September 6, 2011

Shop is back up and running

Well, the hurricane did some pretty severe damage all around my area but we were lucky in the sense that we only had some basement flooding to deal with. I've been able to dry out completely and put my shop back in order but I have a backlog of emails to answer and cabinets which need to be started. I'm trying to answer a few emails per night along with trying to catch up with the work.

Please hang in there if you sent me an email. If you have a deadline before October 15th, you should be aware I might not be able to meet it. If you do have such a deadline, please call me @ 845-418-2760 and leave a message with your info so I can prioritize your email and call you back.

After Irene, this was a ball field in my hometown of Suffern. The water is about 9 feet deep!